PROJECT PROGRESS

Currently, around 90% of the 225 kilometre long tunnel system has been excavated.

In order to construct the complex tunnel system efficiently, the BBT project has been divided into several construction sections, so-called construction lots. This makes it possible to proceed with multiple excavation methods simultaneously in different locations along the new line.

OVERALL PROJECT PROGRESS

207 km
Tunnel Icon
225 km

Of the total of approximately 225 kilometres of tunnel to be built, 207 kilometres have been excavated for the BBT tunnel system to date.

KILOMETRES
102

OF RAILWAY TUNNEL

KILOMETRES
57

OF SERVICE TUNNEL

KILOMETRES
48

ACCESS TUNNEL, RESCUE TUNNEL AND LOGISTICS TUNNEL

KILOMETRES
207

OF WHICH HAVE BEEN EXCAVATED TO DATE

There are currently three active construction lots, one of which is located in Italy and two in Austria.

BRENNER BASE TUNNEL in the heart of the Alps